Domestic Electrical Safety and Upgrades Project Overview
Ongoing safety checks and improvements to more than 10,000 local authority homes
- Electrical surveys for more than 10,000 homes
- Installation of fire detection and alarm systems
- Addition of Surge Protection Devices (SPDs) and Arc Fault Detection Devices (AFDDs)
- Compliance reporting via our ACIMS facilities management platform
- Resident communication
Having entered into a long-term contract with Aston Group in 2012, the London Borough of Waltham Forest’s Housing Department commissioned us to conduct electrical inspections across 10,000+ homes on a rolling five-year basis.
The objectives of this ongoing project are to identify and address any electrical safety concerns, ensure compliance with the latest regulations and implement necessary upgrades to enhance energy efficiency and safety.
In addition to these fire safety upgrades, the work included installing new Surge Protection Devices (SPDs) and Arc Fault Detection Devices (AFDDs).
As part of our relationship with Waltham Forest we helped identify optimal products that offer the best value from reputable manufacturers. This proactive approach minimises the likelihood of repairs, faults, and safety risks, while also enhancing our negotiation capabilities with suppliers.
The Challenge
One of the main challenges was to efficiently manage and prioritise inspections and upgrades across a large number of properties, each with unique electrical systems and requirements. Ensuring compliance with the latest regulations and safety standards was paramount, requiring meticulous planning and execution.
It is also important to minimise disruption to residents during inspections and upgrades. Maintaining regular communication with both residents and the local authority has been a significant undertaking over the years, requiring a structured process to facilitate access.
The Solution
To address these challenges, Aston Group has adopted a five-step approach to the ongoing works. From risk assessments and prioritisation, to on-site inspections, upgrades and utilisation of the Aston Centralised Management System (ACIMS), we explore various strategies and initiatives to facilitate access and ensure the property meets compliance standards at the highest level.
The Results
A substantial number of checks have been completed and all upgrade works adhere to relevant regulations and standards, ensuring both safety and compliance.
Since Aston Group took on the electrical inspections and upgrade programme for Waltham Forest Council’s Housing team, there has been a significant increase in both compliance and resident satisfaction. This improvement highlights the effectiveness of Aston Group’s systematic approach and commitment to the project.