Downland Court Site Notice Board

IVP1169 R3 A4891 small

Health and Safety Documents

Click to download and view:

  1. Insurance
  2. F10
  3. Health and Safety Policy Statement
  4. Health and Safety Law Poster

The Works

The project comprises the upgrade of the existing plantroom and pipe runs to the flats, while keeping the existing system running, enabling works will be required outlined in the design to allow the new system to be installed around this.

Within the flats a new Heat Interface Unit (HIU) and boosted cold water will provide instant un-stored heating, hot and cold water, replacing the existing systems. The building will have a new sprinkler system installed with a new sprinkler tank being installed in one of the undercroft car parking spaces within the parking area of the building

  • Contracts Manager

    Dean Sherrin
    d.sherrin@astongroup.co.uk
    07834 791 141

  • Site Manager

    Dave Allan
    d.allan@astongroup.co.uk
    07715 678 035

  • Resident Liaison Officer

    Olaoluwa Adetola
    o.adetola@astongroup.co.uk
    07712 840 363

  • Health and Safety Manager

    Dan Paizan
    d.paizan@astongroup.co.uk
    07710 710 839